Summary of Project Technical Results
Summary of Project Technical Results (and evaluation) Design, build and operate a 2MW power generator with: Integration of heat and power with an existing chlorine production plant -> Achieved Heat available @ 60°C, but not used Additional treatment hydrogen / air required; H2 scrubber installed High net conversion efficiency, i.e. > 50% electric energy on system... Read more
Read more